Repair of First Floor Facade Wall Crack - J8

Iskaan Tech · dubai, dubai emirate, United-Arab-Emirates

Location
dubai
Job Type
Full-time
Posted
July 19, 2026

Job Description

Repair of First Floor Facade Wall Crack - J8

Location: First Floor Facade Wall, Balcony Side

Current Issue

A crack is observed on the first floor facade wall where the cement/plaster structure is split or damaged.

Scope of Work

  • Inspect the affected facade wall crack area.
  • Remove loose or damaged plaster/cement from the cracked area.
  • Clean and prepare the surface.
  • Repair the crack using suitable exterior-grade repair mortar/material.
  • Finish the repaired surface to match the existing facade.
  • Apply matching exterior paint on the repaired area.
  • Clean the site after completion.

Materials and Quantity Required

  • Facade wall crack repair work – 1 Job
  • Exterior-grade repair mortar / cementitious repair material – As required, Lot
  • Bonding agent / primer – As required, Lot
  • Exterior paint matching existing facade c...

Ready to Apply?

Submit your application for Repair of First Floor Facade Wall Crack - J8 at Iskaan Tech

Apply Now