Additional Access Control System Requirements

Iskaan Tech · dubai, dubai emirate, United-Arab-Emirates

Location
dubai
Job Type
Full-time
Posted
June 23, 2026

Job Description

Additional Access Control System Requirements

Break Down Posted On: June 19, 2026 Closing On: June 22, 2026

JOB REFERENCE: JB

Project Overview

Supply, installation, testing, commissioning, and integration of an additional Access Control System at Spica Residence, including all necessary hardware, software, cabling, accessories, and configuration works for basement, ground floor stair entrances, and main entrance locations. The system shall be integrated with the existing security infrastructure and Fire Alarm System.

Scope of Work

  • Supply and install Access Control Controllers for managing all access‑controlled doors.
  • Supply and install card readers at designated access points.
  • Supply and install electromagnetic locks, mounting brackets, and associated locking accessories.
  • Supply and install exit touch buttons for controlled egress.
  • Supply and configure network switches and connectors require...

Ready to Apply?

Submit your application for Additional Access Control System Requirements at Iskaan Tech

Apply Now